The trail crosses another creek on a bridge. The bridge is shown under construction in Feb 2008.

5S

The trail crosses a creek on a bridge. The bridge is shown under construction in Feb. 2008.

5N

The trail follows a pasture on the left. The pasture is separated by a wire fence.

6S

The trail leaves the pasture on the right.

6N

The trail joins a gravel entrance road to Camp Crowell and intersects with Vale Rd.

7Sa

Turn right to follow the dirt trail along the gravel entrance road to Camp Crowell.

7Na

Use the marked crosswalk to cross Vale Road.

7Sb

Use the crosswalk to cross Vale Rd. and turn left on the other side to walk a short distance along the edge of that road.

7Nb

Next

Home - Contents - Links